Skip to main content

Scrap Cost Calculator

One bad part loses EVERYTHING already spent on it, so the formula grosses it up: you must make extra to ship enough. That is also why scrap is computed LAST - the system has to total the other nine categories before it knows what a bad part is worth. Leave the cost-per-defect field empty and it uses exactly that figure.

You are looking at a sample — these are NOT your numbers. The improvement shown: better nesting lifts material yield from 0.88 to 0.95.

Current State

Labor — Before

Taken from the shared Output at Calculation Settings. If this row needs a different number, edit it right here — other rows are unaffected.

Less common fields (multi-cavity moulds, rented machines, sewing lines, scrap recovery…)
This row: 2,600

Labor — After

Taken from the shared Output at Calculation Settings. If this row needs a different number, edit it right here — other rows are unaffected.

Less common fields (multi-cavity moulds, rented machines, sewing lines, scrap recovery…)
This row: 1,300

Machine — Before

Taken from the shared Output at Calculation Settings. If this row needs a different number, edit it right here — other rows are unaffected.

Less common fields (multi-cavity moulds, rented machines, sewing lines, scrap recovery…)
This row: 4,600

Machine — After

Taken from the shared Output at Calculation Settings. If this row needs a different number, edit it right here — other rows are unaffected.

Less common fields (multi-cavity moulds, rented machines, sewing lines, scrap recovery…)
This row: 2,300

Material — Before

Taken from the shared Output at Calculation Settings. If this row needs a different number, edit it right here — other rows are unaffected.

Less common fields (multi-cavity moulds, rented machines, sewing lines, scrap recovery…)
This row: 13,000

Material — After

Taken from the shared Output at Calculation Settings. If this row needs a different number, edit it right here — other rows are unaffected.

Less common fields (multi-cavity moulds, rented machines, sewing lines, scrap recovery…)
This row: 6,500

Scrap — Before

Taken from the shared Output at Calculation Settings. If this row needs a different number, edit it right here — other rows are unaffected.

This row: 2,653

Scrap — After

Taken from the shared Output at Calculation Settings. If this row needs a different number, edit it right here — other rows are unaffected.

This row: 1,313

Consumable — Before

Taken from the shared Output at Calculation Settings. If this row needs a different number, edit it right here — other rows are unaffected.

Less common fields (multi-cavity moulds, rented machines, sewing lines, scrap recovery…)
This row: 1,300

Consumable — After

Taken from the shared Output at Calculation Settings. If this row needs a different number, edit it right here — other rows are unaffected.

Less common fields (multi-cavity moulds, rented machines, sewing lines, scrap recovery…)
This row: 650

Outsourced processing — Before

Taken from the shared Output at Calculation Settings. If this row needs a different number, edit it right here — other rows are unaffected.

This row: 13,000

Outsourced processing — After

Taken from the shared Output at Calculation Settings. If this row needs a different number, edit it right here — other rows are unaffected.

This row: 6,500

Rework — Before

Taken from the shared Output at Calculation Settings. If this row needs a different number, edit it right here — other rows are unaffected.

This row: 2,600

Rework — After

Taken from the shared Output at Calculation Settings. If this row needs a different number, edit it right here — other rows are unaffected.

This row: 1,300

Packaging — Before

Taken from the shared Output at Calculation Settings. If this row needs a different number, edit it right here — other rows are unaffected.

This row: 13,000

Packaging — After

Taken from the shared Output at Calculation Settings. If this row needs a different number, edit it right here — other rows are unaffected.

This row: 6,500

Logistics — Before

Taken from the shared Output at Calculation Settings. If this row needs a different number, edit it right here — other rows are unaffected.

This row: 13,000

Logistics — After

Taken from the shared Output at Calculation Settings. If this row needs a different number, edit it right here — other rows are unaffected.

This row: 5,000

Factory overhead — Before

Taken from the shared Output at Calculation Settings. If this row needs a different number, edit it right here — other rows are unaffected.

Less common fields (multi-cavity moulds, rented machines, sewing lines, scrap recovery…)
This row: 2,600

Factory overhead — After

Taken from the shared Output at Calculation Settings. If this row needs a different number, edit it right here — other rows are unaffected.

Less common fields (multi-cavity moulds, rented machines, sewing lines, scrap recovery…)
This row: 2,600

Calculation settings

SAVINGS
$34,39050%
See breakdown
Scrap Cost Calculator | costdown.org