How to use Costdown
Costdown is where you record a cost-reduction improvement as numbers, then compare it against other factories in the same country. The first two sections walk you through doing exactly that, start to finish. The rest explain things you cannot work out by looking at the screen — read them when you need them, not before you start. Each input field also has its own explanation in place: see The ? beside each field.
Where to start
It depends on what you came here to do. Three ways in, in no particular order:
| You want to | Go to | What you need first |
|---|---|---|
| Work out what an improvement would save, without publishing anything | Intelligence → Calculator | Nothing. It works without an account and stores nothing. |
| Record an improvement you already made, so others can see and compare it | Workspace → Write | Your cost figures before and after, and how you measured both. |
| See what others in your industry have done | Discover → Projects | Nothing. |
The Calculator and the Write page share the same formulas, so a figure you try out in the Calculator comes out the same when you turn it into a proposal.
Writing a proposal, start to finish
This follows the actual order of the fields on the Write page. Before you open it, five things are worth having in hand — you can write without any of them, but the proposal then sits at a low trust level:
- The cost BEFORE and the cost AFTER, broken down by category — not a single total.
- How you measured those two figures: hand counts, shift logs, production reports, invoices.
- Monthly volume, working days, shifts per day, hours per shift — the system needs them to bring costs down to a single part.
- The money already invested, if any. If none, tick "This proposal needs no investment".
- Machine names, material codes, specific models — the more specific, the more a reader can match it against their own shop floor.
| Step | What you do | What you have afterwards |
|---|---|---|
| 1 | Go to Workspace → Write. Type the title and pick the Industry. | The two required fields are done. Picking the industry is what makes the fields below suggest the right machines and materials. |
| 2 | Pick the Process, the main KPI type and the difficulty. | These three decide which comparison group your proposal lands in. Leave them blank and it still saves, but it stays out of the ranking. |
| 3 | Write the detailed content, then the three description fields: the problem, the mechanism, the short summary. | This is what a reader reads first. The short summary is what appears in listings, so write it as an answer, not as a headline. |
| 4 | Move to the cost table. For each category involved, click "+ Add row" and fill the Before and After columns. | The panel on the right shows the total and the savings percentage immediately, updating as you type — there is no Calculate button to press. |
| 5 | Fill in the conditions of application and the risks. | These two separate a usable proposal from a boast. A reader needs to know where your improvement does NOT apply. |
| 6 | Fill in how the result was verified and the measurement method. | This is the field that decides the trust level. Be specific: what was measured, with what, against what, who signed it off. |
| 7 | Choose hard cash or cost avoidance. If unsure, leave it blank. | The reader learns whether your figure reaches the invoice or not. |
| 8 | Enter the investment and the implementation time, or tick the no-investment box. | The system works out the months to payback — you do not have to. |
| 9 | Press Save. | The proposal appears under My proposals. From then on, every change to a savings figure is recorded: old value, new value, when. |
About the Before and After columns: Before is the current state, After is once the improvement is in place. If a category is untouched by the improvement, leave BOTH columns blank — do not copy the Before figure into After to fill the gap, because that states a category the improvement has nothing to do with.
The panel titled "What the system reads from your figures" sits in the right-hand column and runs while you type, not after you save. It points out things that are hard to notice yourself: a row contributing almost nothing, a category wildly out of line with the rest, a place where you filled one side and left the other blank. Reading it while typing is worth far more than reading it after forty rows are already in.
If you are not ready to publish anything, use Intelligence → Calculator: same formulas, no account needed, nothing stored. Try figures there first and move to Write later if you want.
The ten cost categories
Costs are split into ten categories. You do not have to fill in all ten — only the ones your improvement actually touches.
| Category | Fill it in when |
|---|---|
| Labor | Someone spends time on the product: running a machine, assembling, inspecting, setting up. |
| Machine | A machine runs: depreciation, power, maintenance, machine time occupied. |
| Material | Material that goes into the product. |
| Scrap | Material or product thrown away. |
| Consumables | Tooling, drills, grinding wheels, cutting fluid — things that wear out and get replaced. |
| Outsourcing | A step done by an outside supplier. |
| Rework | Bad parts repaired to pass, rather than scrapped. |
| Packaging | Boxes, trays, film, dunnage. |
| Logistics | Freight tied to this product. |
| Factory overhead | The share accounting has already allocated to the product. Added per month, not multiplied by volume. |
Blank does not mean zero
This is the easiest thing to get wrong, and getting it wrong produces a wrong cost figure that looks exactly like a right one.
A blank field means you have NOT STATED it, not that you are asserting the category is zero. The system distinguishes the two states and displays them differently. If you genuinely mean "this costs nothing", type 0 — that is an assertion, and it is not the same as leaving the field empty.
The reason: a proposal with half its categories blank still produces a very attractive savings figure. If blank counted as zero, nobody could tell "this improvement really saves a lot" apart from "the author has only filled in half of it".
Hard cash or cost avoidance
These two kinds of saving look identical on paper but behave differently in the accounts, so every proposal should say which one it is.
- Hard cash: after the improvement, the amount actually paid each month goes down compared with what is being paid today. You pay 50 million for electricity, replace the motor, and it becomes 42 million — next month's bill is 8 million lower.
- Cost avoidance: the amount paid does not go down; it simply fails to rise the way it would have. The supplier announces an increase from 50 to 55 million, you renegotiate and change material to hold it at 50 million — the bill is still 50 million, and accounting sees nothing go down.
If you are not sure, leave it blank. Blank means "not stated"; guessing means stating something false, and a reader who knows the trade will notice.
The four trust levels
Every proposal carries a trust level. The system RECALCULATES it from the evidence actually present — it is not a label you pick, and writing at greater length does not raise it.
| Level | What it means |
|---|---|
| Unverified | The figure was calculated by the author, with no measurement evidence. |
| Self-evidenced | The figures are complete and the author has stated how they were measured. |
| Counterpart verified | A factory applied it and agreed the real figure jointly. |
| Platform verified | An independent third party checked it and concluded it holds. |
The "How it was verified" field is the most important one when writing a proposal. Something vague like "we observed a clear reduction" leaves the proposal at the lowest level and out of the ranking, no matter how good the numbers are. Something specific — what was measured, with what, against what, who signed it off — raises the level.
The number of posts never counts towards ranking, not even as a tiebreaker. Posting more does not place you higher.
Comparing against other factories
Ranking and comparison happen WITHIN A SINGLE COUNTRY only. An improvement saving 20% in Vietnam and one saving 20% in Germany cannot be compared directly: labour, power and material prices are too far apart.
For that reason comparisons are measured in percentages and in months to payback, never in absolute money. The exchange rate is taken for real at the moment of saving and then frozen, so an old proposal does not change meaning when rates move.
Grouping with colleagues
Colleagues from the same company are grouped by a random join code, not by naming the employer. You create a code, hand it to a colleague, and whoever enters it joins the same group — which lets you share internal material codes and pool figures without saying where you work.
The code is shown ONCE at creation and is never stored in readable form. If you lose it, nobody can retrieve it, administrators included — create a new one and revoke the old.
When someone applies your improvement
A proposal can go on to become a project with two sides: the one who offered the improvement and the one who applied it. The side that applied it submits the real figures afterwards, and the other reviews and confirms them. Only when both agree is the result recorded as verified.
That is the thing a spreadsheet cannot give you: a number that someone else, at another factory, has put their name to as well.
The ? beside each field
Almost every input field has a ? beside it. It opens that field's own explanation, and each one answers four questions: what it is, when to fill it in and when not to, an example with real numbers, and what other situations the field covers beyond its own name.
The fourth is the one worth reading. A field name is the shortest name, not the fullest one — seeing "Weight (kg)" and assuming it is only for metal means skipping the whole material category when you work in plastics, textiles or wood.
Where a field has a formula, the explanation gives the formula and its source.
Why not just use Excel
That is a fair question, because Excel is faster to type into, freer in layout, and works offline. Costdown does not try to win on any of those three.
There are five things a spreadsheet cannot do, and they are the entire reason Costdown exists:
- Share one library of materials, machines and processes — instead of everyone typing their own spelling of the same thing and then being unable to add the numbers up.
- See figures from other factories in the same industry and the same country.
- Let a counterpart who actually applied your improvement confirm the real number themselves.
- Keep an edit history that cannot be deleted: change a savings figure and the system records the old value, the new value, which account changed it, and when.
- One single formula for everyone — no two spreadsheets producing two answers and an argument about which one is right.
If the work in front of you needs none of those five, Excel really is faster, and we would rather say so plainly.
When something does not match
If anything in the product behaves differently from what this page describes, that is our mistake and not yours — please tell us through the İletişim. Messages are stored and given a case number immediately, so your request does not disappear.
Sektöre göre rehberler
Genel geçer değil, sektöre özel yazıldı: maliyeti nasıl ayrıştıracağınız, sık yapılan hatalar ve fabrikanızda bu rakamları nereden bulacağınız.
Tüm Sektörler İçin Ortak
- Tasarruf gerçek mi? Darboğazlar ve bir rakamın paraya dönüştüğü üç yol
Bir makineyi hızlandırmak neden genellikle hiçbir şey kazandırmaz, bir maliyet tablosundaki rakam ne zaman gerçek nakde dönüşür, ve muhasebe sormadan önce gerçek nakit tasarrufunu önlenen maliyetten nasıl ayırt edersiniz.
- Neredeyse kimsenin doldurmadığı altı alan, ve her biri maliyeti hangi yöne büker
Malzeme verimi, kişisel ve makine payları, enerji, ambalaj birimi ve parti başına sabit maliyet: genellikle boş bırakılan altı girdi, ve altısından beşinin maliyeti neden gerçekte olduğundan ucuz gösterdiği.
- Üretim Sırasına Göre On Üretim Maliyeti Kalemi
Costdown'ın bir ürünü fiyatlandırmak için kullandığı on maliyet kalemi — malzeme, makine, işçilik, takım, hurda, yeniden işleme, dış kaynak, ambalaj, lojistik, atölye genel gideri — her biri için formül ve çözülmüş bir örnekle.
- Tasarruf Yüzdesinin Doğru Çıkması İçin Öncesi ve Sonrası Maliyet Tabloları Nasıl Doldurulur
Mevcut durum ve iyileştirilmiş maliyet tablolarındaki her satırın nasıl girileceği - kalem adı, standart kod, marka, aylık üretim miktarı, çevrim süresi - böylece sistem tasarruf yüzdesini, ROI'yi ve geri ödeme süresini doğru hesaplar.
- Parça Başına Yeniden İşleme Maliyeti: Nasıl Hesaplanır, ve Neden Hurda Değildir
Parça başına yeniden işleme maliyetinin formülü, kurtarılabilen bir parçayı atılması gereken parçadan nasıl ayırt edeceğiniz, ve ikisini birleştirmenin her seferinde maliyeti neden şişirdiği.
- Birim Başına Ambalaj Maliyeti: Ağırlığa Göre Değil, Paket Miktarına Göre Fiyatlandırın
Karton, torba, köpük, etiket, palet gibi bir birim için ambalaj maliyetinin bir pakete kaç birim sığdığından nasıl hesaplanacağı, ve ambalajın neden malzeme kalemine katlanmaması gerektiği.
- Dış Kaynak İşleme Maliyeti: Parça Başına Fiyat, ve Nakliyeyle Sınır
Isıl işlem, kaplama, muayene gibi taşeron adımların ürün maliyetine nasıl gireceği, neden malzeme olmadıkları, ve dış kaynağı kendi bünyenizde yapmakla nasıl karşılaştıracağınız.
- Atölye Genel Giderini İki Kez Saymadan Ürün Maliyetine Dağıtma
Bina amortismanı, aydınlatma, gözetim, genel bakım gibi atölye genel giderinin bir birimin maliyetine nasıl gireceği, ve bu paranın iki kez sayıldığı tek yer.
- Bir maliyet düşürme projesi başkalarının güveneceği şekilde nasıl belgelenir
Costdown'da bir tasarruf projesini kaydetmenin dört adımı, dört kanıta dayalı güven düzeyi, bir ülke içinde kıyaslamanın nasıl çalıştığı, ve doğrulanmış bir projenin yapısını yeniden nasıl kullanacağınız.
Konut İnşaatı
- Konut inşaatı maliyet dökümü: inşaat sırasına göre on maliyet kalemi
Bir konut inşaat kalemini doğru maliyetlendirme - malzeme, ekipman, işçilik, fire, taşeron, yeniden işleme, nakliye ve saha genel gideri - ve hiçbir iki projenin doğrudan karşılaştırılacak kadar aynı büyüklükte olmamasının nedeni.
İnşaat Mühendisliği ve Altyapı
- Altyapı inşaatı maliyet dökümü (yol, köprü, menfez): on kategorinin tamamı
Bir yol, köprü veya menfez iş kalemini doğru maliyetlendirme - toprak işleri, ekipman, işçilik, fire, bağımsız test ve taşeronlar, yeniden işleme, nakliye ve bertaraf, saha genel gideri.
Ticari ve Endüstriyel İnşaat
- Ticari ve endüstriyel inşaat: konutla aynı maliyet yapısı
Ticari binalar ve endüstriyel tesisler, konut inşaatıyla tamamen aynı on kategorili maliyet yapısını ve birim başına maliyetlendirmeyi kullanır - yalnızca ölçek farklıdır.
Mimarlık ve Planlama
- Mimarlık ve planlama hizmetleri maliyet dökümü: saatler önde, malzeme değil
Bir tasarım ofisini doğru maliyetlendirme - faturalanabilir saatler ve ofis genel gideri önce gelir, alt danışmanlar ve tasarım revizyonları gerçekten büyük olan iki kalemdir, fiziksel üretimin aksine.
Yük Taşımacılığı
- Yük taşımacılığı maliyet dökümü: araç ve yakıt önde, boş dönüş dahil
Bir yük seferini işin gerçekte yürüdüğü şekilde maliyetlendirme - araç, yakıt ve şoför önde gelir, boş dönüş bacağı fiziksel üretimden farklı olarak hesaba dahil edilir.
Deniz Taşımacılığı
- Deniz taşımacılığı maliyet dökümü: kara taşımacılığıyla aynı çerçeve, üç fark
Deniz taşımacılığı, kara yük taşımacılığıyla tamamen aynı araç işletme maliyet çerçevesini kullanır - yalnızca üç şey farklıdır: bunker yakıt, liman/kılavuzluk ücretleri, ve rıhtım beklerken demuraj.
Demiryolu Taşımacılığı
- Demiryolu taşımacılığı maliyet dökümü: aynı çerçeve, hat erişim ücretleri farklı
Demiryolu taşımacılığı işletmeleri, kara ve deniz yük taşımacılığıyla aynı araç işletme maliyet çerçevesini kullanır - gerçek farklar hat erişim ücretleri ve manevra/marşandiz maliyetidir.
Karayolu Yolcu Taşımacılığı
- Karayolu yolcu taşımacılığı: yük taşımacılığıyla aynı yapı
Karayolu yolcu taşımacılığı, yük taşımacılığıyla tamamen aynı araç işletme maliyet yapısını kullanır - yalnızca birim (yolcu-mil) ve tek bir maliyet (boş koltuklar) farklıdır.
Gemi İnşa
- Gemi inşa maliyet dökümü: blok inşası, kuru havuz merkezi varlıktır
Bir gemi yapımını modern tersanelerin gerçekten çalıştığı şekilde maliyetlendirme - blok/bölüm montajı, merkezi sabit varlık olarak kuru havuz veya kızak, ve kendi maliyet olayı olarak denize indirme.
Demiryolu Ekipmanı Üretimi
- Demiryolu ekipmanı üretimi: makine imalatıyla aynı yapı
Tren vagonu ve lokomotif üretimi, makine ve endüstriyel ekipman üretimiyle tamamen aynı maliyet yapısını kullanır - gövde imalatı, yapısal kaynak, ve aktarma/elektrik montajı.
Diğer Taşıma Ekipmanı Üretimi
- Diğer taşıma ekipmanı üretimi: makine imalatıyla aynı yapı
Motosiklet, bisiklet, römork ve diğer taşıma ekipmanı üretimi (otomotiv, gemi, demiryolu dışında), makine ve endüstriyel ekipman üretimiyle tamamen aynı maliyet yapısını kullanır.
Madencilik
- Madencilik maliyet dökümü: dekapaj oranı maliyetin çoğunu belirler
Maden çıkarmayı sektörün gerçekten çalıştığı şekilde maliyetlendirme - satın alınan malzeme yok, en büyük maliyet ekipman ve işçiliğe dağıtılan dekapaj oranıdır, ve artık maddeler hurdanın yerini alır.
Petrol ve Gaz Çıkarma
- Petrol ve gaz çıkarma maliyet dökümü: kuyu sondaj maliyeti ve doğal düşüş
Yukarı akış petrol ve gaz çıkarmayı maliyetlendirme - madencilik gibi satın alınan malzeme yok, artı bu sektöre özgü iki özellik: kuyu başına sondaj maliyeti ve zamanla doğal üretim düşüşü.
Petrol ve Gaz
- Petrol ve gaz: yukarı akış çıkarmayla aynı yapı
Petrol ve gaz sektörü genel olarak, yukarı akış petrol ve gaz çıkarmayla tamamen aynı maliyet yapısını kullanır - rezervlere karşı amortismana tabi kuyu başına sondaj maliyeti, ve doğal üretim düşüşü.
Elektrik ve Su Tesisleri
- Elektrik ve su tesisleri maliyet dökümü: iletim kaybı hurdanın yerini alır
Elektrik üretimi ve dağıtımını maliyetlendirme - yenilenebilir enerji için yakıt maliyeti sıfır olabilir, ve iletim/dağıtım kaybı ayrı-ürün hurdasının aksine toplam çıktının bir yüzdesidir.
Tarla Tarımı
- Tarla tarımı maliyet dökümü: hasat sonrası kayıp hurdanın yerini alır
Tarla tarımını sektörün gerçekten çalıştığı şekilde maliyetlendirme — girdi maliyeti ekili alana değil gerçek hasat çıktısına göre, hasat sonrası kayıp birikimli bir zincir olarak, ve arazi kirası kendi genel gider satırı olarak.
Hayvancılık
- Hayvancılık maliyet dökümü: yem dönüşüm oranı maliyeti belirler
Hayvancılığı sektörün gerçekten çalıştığı şekilde maliyetlendirme — yem birim fiyatına değil dönüşüm oranına göre maliyetlendirilir, sürü kaybı hurdanın aksine geri kazanılamaz, ve atık yönetimi gerçek bir genel gider satırıdır.
Su Ürünleri
- Su ürünleri maliyet dökümü: iki çok farklı model — avcılık ve yetiştiricilik
Su ürünlerini iki yapısal olarak farklı modelinde maliyetlendirme — avcılık balıkçılığı sefer başına yakıtla, yetiştiricilik yem dönüşüm oranı ve aşamaya göre kayıpla, hayvancılıkla aynı ilke.
Orman Hasadı
- Orman hasadı maliyet dökümü: hasat hakları ve metreküp birimi
Orman hasadını sektörün gerçekten çalıştığı şekilde maliyetlendirme — madencilik gibi satın alınan malzeme yok, çevrim için ayakta duran hacme karşı amortismana tabi hasat hakları veya arazi kirası, ve araziye göre ayrı maliyetlendirilen sürütme.
Ahşap Ürün Üretimi
- Ahşap ürün üretimi maliyet dökümü: kesim verimi ağırlıkla değil hacimle
Ham kereste ve panel üretimini maliyetlendirme — mobilyanın yukarısındaki aşama, kesim verimi ağırlık yerine metreküp hacmiyle ölçülür, ve mühendislik panosu bir tutkal satırı ve ısıl pres enerjisi ekler.
Kağıt Üretimi
- Kağıt üretimi maliyet dökümü: hamur verimi ve makine amortismanının ötesinde enerji
Hamur ve kağıt üretimini maliyetlendirme — ara bir kimyasal adımda merkezi rakam olarak hamur verimi, genellikle makine amortismanını aşan buhar enerjisi, ve başlangıçtaki bant kopmalarının gerçek malzeme kaybı olması.
Bakım ve Onarım
- Bakım ve onarım maliyet dökümü: birim bir işçilik saatidir, ürün değil
Bakım ve onarım hizmetini gerçekten çalıştığı şekilde maliyetlendirme — birim bir işçilik saati veya servis çağrısıdır, yedek parçalar belirli bir iş başına satın alınır, ve yeniden işleme yanlış teşhisten kaynaklanan bir tekrarı ifade eder.
Depolama
- Depolama maliyet dökümü: birim alan çarpı zamandır, ürün değil
Depolamayı gerçekten çalıştığı şekilde maliyetlendirme — birim depolama alanı çarpı zamandır, fire bekleme süresi ve depolama koşullarından kaynaklanan hurda eşdeğeridir, ve depo kirası en büyük maliyet satırıdır.
Gayrimenkul Yönetimi
- Gayrimenkul yönetimi maliyet dökümü: taşeronlu iş en büyük satırdır
Kiralanan mülk operasyonlarını gerçekten çalıştığı şekilde maliyetlendirme — birim, ay başına yönetilen metrekaredir, ve taşeronlu iş (temizlik, peyzaj, teknik bakım) inşaatın aksine en büyük maliyet satırıdır.
Yarı İletken Montaj ve Test
- Yarı iletken montaj ve test maliyeti: hurdanın en pahalı olduğu yer
Arka uç operasyonlarını maliyetlendirme — die bağlama, tel bağlama, kapsülleme, test — en değerli bileşenin ürüne en ilk adımda girdiği ve sonraki her kaybın onu taşıdığı yer.