How to use Costdown
Costdown is where you record a cost-reduction improvement as numbers, then compare it against other factories in the same country. The first two sections walk you through doing exactly that, start to finish. The rest explain things you cannot work out by looking at the screen — read them when you need them, not before you start. Each input field also has its own explanation in place: see The ? beside each field.
Where to start
It depends on what you came here to do. Three ways in, in no particular order:
| You want to | Go to | What you need first |
|---|---|---|
| Work out what an improvement would save, without publishing anything | Intelligence → Calculator | Nothing. It works without an account and stores nothing. |
| Record an improvement you already made, so others can see and compare it | Workspace → Write | Your cost figures before and after, and how you measured both. |
| See what others in your industry have done | Discover → Projects | Nothing. |
The Calculator and the Write page share the same formulas, so a figure you try out in the Calculator comes out the same when you turn it into a proposal.
Writing a proposal, start to finish
This follows the actual order of the fields on the Write page. Before you open it, five things are worth having in hand — you can write without any of them, but the proposal then sits at a low trust level:
- The cost BEFORE and the cost AFTER, broken down by category — not a single total.
- How you measured those two figures: hand counts, shift logs, production reports, invoices.
- Monthly volume, working days, shifts per day, hours per shift — the system needs them to bring costs down to a single part.
- The money already invested, if any. If none, tick "This proposal needs no investment".
- Machine names, material codes, specific models — the more specific, the more a reader can match it against their own shop floor.
| Step | What you do | What you have afterwards |
|---|---|---|
| 1 | Go to Workspace → Write. Type the title and pick the Industry. | The two required fields are done. Picking the industry is what makes the fields below suggest the right machines and materials. |
| 2 | Pick the Process, the main KPI type and the difficulty. | These three decide which comparison group your proposal lands in. Leave them blank and it still saves, but it stays out of the ranking. |
| 3 | Write the detailed content, then the three description fields: the problem, the mechanism, the short summary. | This is what a reader reads first. The short summary is what appears in listings, so write it as an answer, not as a headline. |
| 4 | Move to the cost table. For each category involved, click "+ Add row" and fill the Before and After columns. | The panel on the right shows the total and the savings percentage immediately, updating as you type — there is no Calculate button to press. |
| 5 | Fill in the conditions of application and the risks. | These two separate a usable proposal from a boast. A reader needs to know where your improvement does NOT apply. |
| 6 | Fill in how the result was verified and the measurement method. | This is the field that decides the trust level. Be specific: what was measured, with what, against what, who signed it off. |
| 7 | Choose hard cash or cost avoidance. If unsure, leave it blank. | The reader learns whether your figure reaches the invoice or not. |
| 8 | Enter the investment and the implementation time, or tick the no-investment box. | The system works out the months to payback — you do not have to. |
| 9 | Press Save. | The proposal appears under My proposals. From then on, every change to a savings figure is recorded: old value, new value, when. |
About the Before and After columns: Before is the current state, After is once the improvement is in place. If a category is untouched by the improvement, leave BOTH columns blank — do not copy the Before figure into After to fill the gap, because that states a category the improvement has nothing to do with.
The panel titled "What the system reads from your figures" sits in the right-hand column and runs while you type, not after you save. It points out things that are hard to notice yourself: a row contributing almost nothing, a category wildly out of line with the rest, a place where you filled one side and left the other blank. Reading it while typing is worth far more than reading it after forty rows are already in.
If you are not ready to publish anything, use Intelligence → Calculator: same formulas, no account needed, nothing stored. Try figures there first and move to Write later if you want.
The ten cost categories
Costs are split into ten categories. You do not have to fill in all ten — only the ones your improvement actually touches.
| Category | Fill it in when |
|---|---|
| Labor | Someone spends time on the product: running a machine, assembling, inspecting, setting up. |
| Machine | A machine runs: depreciation, power, maintenance, machine time occupied. |
| Material | Material that goes into the product. |
| Scrap | Material or product thrown away. |
| Consumables | Tooling, drills, grinding wheels, cutting fluid — things that wear out and get replaced. |
| Outsourcing | A step done by an outside supplier. |
| Rework | Bad parts repaired to pass, rather than scrapped. |
| Packaging | Boxes, trays, film, dunnage. |
| Logistics | Freight tied to this product. |
| Factory overhead | The share accounting has already allocated to the product. Added per month, not multiplied by volume. |
Blank does not mean zero
This is the easiest thing to get wrong, and getting it wrong produces a wrong cost figure that looks exactly like a right one.
A blank field means you have NOT STATED it, not that you are asserting the category is zero. The system distinguishes the two states and displays them differently. If you genuinely mean "this costs nothing", type 0 — that is an assertion, and it is not the same as leaving the field empty.
The reason: a proposal with half its categories blank still produces a very attractive savings figure. If blank counted as zero, nobody could tell "this improvement really saves a lot" apart from "the author has only filled in half of it".
Hard cash or cost avoidance
These two kinds of saving look identical on paper but behave differently in the accounts, so every proposal should say which one it is.
- Hard cash: after the improvement, the amount actually paid each month goes down compared with what is being paid today. You pay 50 million for electricity, replace the motor, and it becomes 42 million — next month's bill is 8 million lower.
- Cost avoidance: the amount paid does not go down; it simply fails to rise the way it would have. The supplier announces an increase from 50 to 55 million, you renegotiate and change material to hold it at 50 million — the bill is still 50 million, and accounting sees nothing go down.
If you are not sure, leave it blank. Blank means "not stated"; guessing means stating something false, and a reader who knows the trade will notice.
The four trust levels
Every proposal carries a trust level. The system RECALCULATES it from the evidence actually present — it is not a label you pick, and writing at greater length does not raise it.
| Level | What it means |
|---|---|
| Unverified | The figure was calculated by the author, with no measurement evidence. |
| Self-evidenced | The figures are complete and the author has stated how they were measured. |
| Counterpart verified | A factory applied it and agreed the real figure jointly. |
| Platform verified | An independent third party checked it and concluded it holds. |
The "How it was verified" field is the most important one when writing a proposal. Something vague like "we observed a clear reduction" leaves the proposal at the lowest level and out of the ranking, no matter how good the numbers are. Something specific — what was measured, with what, against what, who signed it off — raises the level.
The number of posts never counts towards ranking, not even as a tiebreaker. Posting more does not place you higher.
Comparing against other factories
Ranking and comparison happen WITHIN A SINGLE COUNTRY only. An improvement saving 20% in Vietnam and one saving 20% in Germany cannot be compared directly: labour, power and material prices are too far apart.
For that reason comparisons are measured in percentages and in months to payback, never in absolute money. The exchange rate is taken for real at the moment of saving and then frozen, so an old proposal does not change meaning when rates move.
Grouping with colleagues
Colleagues from the same company are grouped by a random join code, not by naming the employer. You create a code, hand it to a colleague, and whoever enters it joins the same group — which lets you share internal material codes and pool figures without saying where you work.
The code is shown ONCE at creation and is never stored in readable form. If you lose it, nobody can retrieve it, administrators included — create a new one and revoke the old.
When someone applies your improvement
A proposal can go on to become a project with two sides: the one who offered the improvement and the one who applied it. The side that applied it submits the real figures afterwards, and the other reviews and confirms them. Only when both agree is the result recorded as verified.
That is the thing a spreadsheet cannot give you: a number that someone else, at another factory, has put their name to as well.
The ? beside each field
Almost every input field has a ? beside it. It opens that field's own explanation, and each one answers four questions: what it is, when to fill it in and when not to, an example with real numbers, and what other situations the field covers beyond its own name.
The fourth is the one worth reading. A field name is the shortest name, not the fullest one — seeing "Weight (kg)" and assuming it is only for metal means skipping the whole material category when you work in plastics, textiles or wood.
Where a field has a formula, the explanation gives the formula and its source.
Why not just use Excel
That is a fair question, because Excel is faster to type into, freer in layout, and works offline. Costdown does not try to win on any of those three.
There are five things a spreadsheet cannot do, and they are the entire reason Costdown exists:
- Share one library of materials, machines and processes — instead of everyone typing their own spelling of the same thing and then being unable to add the numbers up.
- See figures from other factories in the same industry and the same country.
- Let a counterpart who actually applied your improvement confirm the real number themselves.
- Keep an edit history that cannot be deleted: change a savings figure and the system records the old value, the new value, which account changed it, and when.
- One single formula for everyone — no two spreadsheets producing two answers and an argument about which one is right.
If the work in front of you needs none of those five, Excel really is faster, and we would rather say so plainly.
When something does not match
If anything in the product behaves differently from what this page describes, that is our mistake and not yours — please tell us through the 문의하기. Messages are stored and given a case number immediately, so your request does not disappear.
산업별 가이드
일반론이 아니라 업종별로 작성했습니다. 원가를 나누는 방법, 자주 틀리는 지점, 그리고 현장의 어디에 숫자가 있는지.
전 업종 공통
- 원가절감 사례를 남들이 믿을 수 있게 남기는 법
Costdown에 원가절감 과제를 기록하는 네 단계, 증거로 정해지는 네 단계 신뢰 수준, 같은 나라 안에서만 하는 벤치마크, 그리고 검증된 사례의 구조를 수평전개하는 방법.
- 절감한 그 돈, 진짜인가 — 병목과 현금이 되는 세 가지 조건
설비를 빠르게 해도 이익이 늘지 않는 이유. 계산된 절감액이 실제 현금이 되는 조건과, 제안서를 내기 전에 스스로 판별하는 방법을 공정 제약의 관점에서 정리합니다.
- 가장 자주 비어 있는 여섯 항목과, 각각이 원가를 어느 쪽으로 틀리게 하는가
수율, 여유율, 전력비, 상자당 수량, 로트당 고정비. 비어 있기 쉬운 항목들입니다. 공백과 「0」은 다른 것이며, 혼동하면 완전히 정상으로 보이는 잘못된 원가가 나옵니다.
- 원가 계산식 — 두 개의 식은 서로 다른 질문에 답한다
기간 회계식과 단위원가식은 다른 질문에 답합니다. 회계 3요소와 10개 항목의 대응표, 그리고 두 숫자가 어긋나는 것이 정상인 이유.
기계가공・정밀절삭
- 기계가공 원가계산 — 10개 항목을 공정 순서대로
절삭 부품의 원가를 재료·기계시간·공수·공구·불량·재작업·외주·포장·운반·간접비까지 빠짐없이 쌓는 방법. 같은 도면으로 두 사람이 다른 금액을 내는 이유부터 시작합니다.
- 데이터가 없는 공장은 원가계산을 어디서부터 시작하나
시스템도 한 달간의 조사도 필요 없습니다. 부품 하나를 골라 일주일 안에 세 숫자를 측정하고, 나머지는 공장에 이미 있는 서류에서 가져오면 됩니다.
- 공구비를 개당으로 환산하는 법과, 낮추는 세 가지
공구는 박스 단위로 사고 한 개씩 소비됩니다. 환산하는 법, 돈을 들이지 않고 공구수명을 재는 법, 그리고 실제로 이익까지 도달하는 세 가지 개선.
판금: 레이저 절단과 절곡
- 판금가공 원가계산 — 공정마다 자기 단위로 잰다
레이저 절단과 절곡이 들어간 판금 부품의 원가를 10개 항목으로 분해합니다. 절단은 절단길이, 타공은 타발수, 절곡은 절곡수 — 평균 내면 진짜 원가 동인이 사라집니다.
- 네스팅과 재료 수율, 그리고 스켈레톤은 얼마짜리인가
판금 원가에서 재료는 대개 가장 큰 항목이고, 그 대부분은 네스팅이 결정합니다. 실제 수율을 재는 법, 스켈레톤 평가, 그리고 원가표를 반드시 좋아 보이게 만드는 이중공제.
봉제
- 봉제 원가계산 — 임가공비 안에 무엇이 들어 있는지 10개로 나눈다
원단, 부자재, 재단, 봉제 분(分), 완성, 포장. 바이어에게 제시하는 임가공비를 분해해서, 가격 협상을 감이 아니라 근거로 할 수 있게 합니다.
- 표준시간·분당 단가·가동률 — 봉제 원가를 결정하는 세 숫자
봉제 원가는 표준시간 × 분당 단가 ÷ 가동률. 셋 다 틀리기 쉽고, 세 오류가 전부 같은 방향 — 원가를 싸 보이게 하는 쪽 — 으로 작용합니다.
- 한 벌 요척과, 원단이 실제로 사라지는 곳
원단은 봉제 원가에서 가장 큰 항목입니다. 요척을 마카에서 가져오는 법, 마카 효율이 재는 범위, 그리고 마카에는 절대 나타나지 않는 손실들.
사출성형・고무
- 사출성형 원가계산 — 사출량, 사이클 타임, 캐비티 수
성형품의 원가를 10개 항목으로 분해합니다. 거의 모든 것이 세 숫자로 귀결되고, 그중 하나가 틀리면 한 줄이 아니라 표 전체가 움직입니다.
- 금형 상각과 캐비티 수의 경제성 — 금형 판단 뒤의 산수
캐비티가 많으면 금형이 비싸고 부품이 쌉니다 — 어느 지점까지는. 금형비를 정직하게 배분하는 법과, 두 캐비티 안을 감이 아니라 숫자로 비교하는 법.
- 분쇄재와 회수가치 — 유일하게 빼는 줄
러너와 불량품은 분쇄해서 다시 성형할 수 있습니다. 그 회수를 정직하게 평가하는 법과, 원가표를 조용히 좋아 보이게 만드는 이중공제.
- 고무 성형 원가 — 사출성형과 거의 같다, 결정적인 한 가지만 빼고
가황 고무 부품의 원가계산. 구조는 사출성형과 거의 겹치지만, 버를 분쇄해서 되쓸 수 없습니다 — 그 한 가지가 어디를 개선할 가치가 있는지를 바꿉니다.
가구 제조
- 가구 제조 원가계산 — 세 가지 재료, 세 개의 다른 단위
수납장이나 의자의 원가를 10개 항목으로 분해합니다. 판재·엣지·하드웨어는 각각 다른 단위로 사고, 이를 한 줄로 합치면 재료비가 조용히 망가집니다.
- 판재 재단 수율 — 가장 짧은 시간에 가장 큰 금액이 움직이는 숫자
판재비는 부품 면적이 아니라 몇 장을 열었느냐로 결정됩니다. 기존 기록에서 실제 수율을 재는 법과, 최적화 소프트의 이론값으로 원가를 만들면 안 되는 이유.
- 부피 화물의 운임 — 무게가 차기 전에 공간이 먼저 찬다
가구 운임은 무게가 아니라 부피로 결정되고, 그것이 개선의 가치를 바꿉니다. 한 대당 운임 계산법과, 플랫팩이 설계 판단이기 전에 원가 판단인 이유.
인쇄와 지기
- 인쇄물 원가계산 — 건별로 생기는 비용과 부수별로 생기는 비용
인쇄 원가를 10개 항목으로 분해합니다. 이 업종은 「한 건에 한 번」과 「한 부에 한 번」이 가장 심하게 섞여 있고, 둘을 혼동하면 소량이 부당하게 싸 보입니다.
- 파지 — 수량에 비례하지 않는 재료비
색을 맞추며 버리는 종이는 변동비의 옷을 입은 고정비입니다. 원가표 어느 줄에 두느냐가 소량 가격이 맞는지를 결정합니다.
- 종이 사용량 — 한 장에 몇 개, 그리고 재단 여백은 얼마짜리인가
종이는 인쇄 원가에서 가장 큰 항목인 경우가 많고, 그 대부분은 면 배치가 결정합니다. 실사용량을 재는 법, 종이 규격 질문을 인쇄기 질문보다 먼저 해야 하는 이유, 그리고 손지의 진짜 가치.
식품 가공
- 식품 가공 원가계산 — 수율, 배치, 그리고 배치와 배치 사이
가공식품의 원가를 10개 항목으로 분해합니다. 원료는 공정마다 줄고, 세척이나 품목 교체처럼 「배치 사이」에 생기는 비용은 개수가 아니라 배치에 속합니다.
- 가공 수율은 곱해져서 줄어든다, 더해지는 게 아니다
공정마다의 손실은 누적되어, 작은 손실의 연속이 그 합보다 훨씬 큽니다. 이미 있는 두 숫자로 사슬 전체를 재는 법, 그리고 과충전이 숨어 있는 곳.
- 세척과 품목 교체 — 개당이 아니라 배치당 비용
배치 사이 세척 비용은 배치가 크든 작든 거의 같습니다. 그것이 소량 생산을 정말로 비싸게 만드는 이유입니다. 계상법과 최소 배치 정하는 법.
전자 조립
- PCB 조립 원가계산 — 부품, 실장 점수, 그리고 BOM에 없는 것
조립 완료된 기판의 원가를 10개 항목으로 분해합니다. 이 업종을 가르는 두 가지: BOM이 원가를 지배하고, 기계시간이 기판 수가 아니라 실장 점수에 비례합니다.
- 수백 줄짜리 BOM — 합계를 바꾸지 않고 꼬리를 묶는 법
자재명세서의 대부분은 합쳐도 거의 움직이지 않는 싼 부품입니다. 표를 읽을 수 있게 유지하면서 합계를 정확히 일치시키는 법, 그리고 묶으면 필요한 것이 사라지는 세 경우.
- 실장 점수와 교체 — SMT 가격을 결정하는 두 숫자
SMT 조립비는 몇 점을 실장하고 몇 번 셋업하느냐로 결정됩니다. 둘 다 라인이 이미 내놓는 데이터로 잴 수 있고, 각각 다른 개선을 가리킵니다.
기계 제조와 산업설비
- 기계 한 대의 원가계산 — 부품에서 쌓아 올린다, 공수에서 나눠 내리지 않는다
산업기계나 설비의 원가를 10개 항목으로. 자체 제작품·구매품·외주품은 계산법이 서로 다르고, 자재를 지급하면 이중계상이 생깁니다. 시운전도 비용의 한 줄입니다.
- 초기비용 — 설계·치구·1호기, 그리고 몇 대로 나눌 것인가
수량이 적으면 일회성 비용은 얇아지지 않습니다. 어느 것이 일회성인지 판정하는 법, 나누는 수를 고르는 법, 그리고 무시하면 견적이 싸 보이는데 손해 보는 구조.
용접과 철골
- 용접 구조물 원가계산 — 개수가 아니라 용접장으로 잰다
철골이나 용접 구조물의 원가를 10개 항목으로 분해합니다. 같은 무게의 두 제품이 크게 다른 원가가 되는 것은, 이 업종을 움직이는 것이 용접장과 아크타임이지 개수가 아니기 때문입니다.
- 용접 변형 — 원가표 어느 줄에도 나타나지 않는 비용
열이 강재를 움직이고, 그것을 교정하는 데 쓴 돈은 네 항목에 흩어져 아무도 보지 못합니다. 하나의 숫자로 모으는 법과, 수량이 늘면 치구가 교정을 이기는 이유.
반도체: 조립과 검사
- 반도체 후공정 원가계산 — 불량이 가장 비싼 업종
다이 본딩, 와이어 본딩, 몰딩, 검사의 원가. 가장 비싼 자재가 첫 공정에서 이미 제품 안에 들어가므로, 뒤로 갈수록 손실의 대가가 급격히 커집니다.
주류
- 주류 원가계산 — 시간 자체가 얼마인가
원료와 가공에 더해, 숙성이 세 가지 비용을 만듭니다 — 묶여 있는 자금, 엔젤스 셰어, 그리고 몇 달에서 몇 년씩 점유되는 저장 공간.
담배 제품
- 담배 제품 원가 — 수분이 사용량 숫자를 흔든다
배치 원가는 식품 가공과 같고, 고유한 점 하나는 원료 중량이 수분에 따라 달라져서 사용량을 공통 기준으로 환산해야 배치끼리 비교된다는 것입니다.
가죽 제품과 신발
- 가죽 제품 원가 — 봉제와 같다, 다만 재료가 균일하지 않다
신발이나 가죽 제품의 원가계산. 라인 생산과 표준시간은 봉제와 완전히 같지만, 가죽은 장마다 형태와 품질이 달라 이론 소요량이 거의 의미가 없습니다.
화학제품 제조
- 화학제품 원가 — 식품 가공과 같다, 팔리는 부산물이 더해질 뿐
배치식 화학제품의 원가계산. 수율의 사슬과 배치 사이 세척은 식품 가공과 같고, 더해지는 것은 한 공정이 팔리는 산물을 둘 이상 낼 때 비용을 어떻게 나누느냐입니다.
건축자재
- 건축자재 원가 — 운반비가 각주가 아니라 주요 항목
레미콘, 블록, 콘크리트 2차제품의 원가계산. 원료가 싸고 무거워서 무게와 거리로 계산되는 운반비가 가공비를 넘는 일이 많고, 그래서 배송 반경이 원가표의 일부가 됩니다.
자동차 부품
- 자동차 부품 원가 — 구조는 기계제조와 같고, 수량이 뒤집는다
차량용 부품이나 어셈블리의 원가계산. 전개 방식은 기계제조와 같지만, 양산이라 일회성 비용이 가라앉고 대신 품질 비용이 떠오릅니다.
항공·우주 부품
- 항공 부품 원가 — 깎아 내는 비율, 그리고 서류의 비용
항공기 부품의 원가계산. 공정은 기계가공과 같지만, 소재가 비싸 깎아 내는 비율이 결정적이고 증명 서류도 실제 비용입니다.
의료기기
- 의료기기 원가 — 생산 환경을 유지하는 비용을 더한다
의료기기의 원가계산. 조립은 전자, 플라스틱 부품은 사출성형을 따르고, 거기에 고유 항목 하나 — 생산 환경 유지는 생산량이 아니라 시간으로 발생합니다.
스포츠 용품
- 스포츠 용품 원가 — 하나의 제품, 밑에 여러 장의 원가표
라켓, 러닝화, 자전거는 플라스틱·섬유·목재·가죽·금속을 한 제품에 조합합니다. 각 부품을 해당 업종의 방법으로 계산하고, 세부를 잃지 않고 합치는 법.
재생에너지 설비
- 재생에너지 설비 원가 — 세 업종이 한 제품에, 그리고 지켜야 할 경계
모듈, 인버터, 구조물의 원가계산. 부분마다 다른 편을 따르고, 원가표는 공장 출하에서 멈춰야 합니다 — 현장 설치는 서비스이지 제품의 일부가 아닙니다.
낱개로 세지 않는 업종
- 제품이 「한 개」가 아닌 업종 — 무엇을 단위로 삼을지 먼저 정한다
건설, 운송, 자원, 전기·수도, 농림수산에는 셀 수 있는 제품이 없습니다. 쓸 수 있는 단위를 고르는 법과, 이 제품이 아직 해 주지 못하는 것을 정직하게 밝힙니다.