How to use Costdown
Costdown is where you record a cost-reduction improvement as numbers, then compare it against other factories in the same country. The first two sections walk you through doing exactly that, start to finish. The rest explain things you cannot work out by looking at the screen — read them when you need them, not before you start. Each input field also has its own explanation in place: see The ? beside each field.
Where to start
It depends on what you came here to do. Three ways in, in no particular order:
| You want to | Go to | What you need first |
|---|---|---|
| Work out what an improvement would save, without publishing anything | Intelligence → Calculator | Nothing. It works without an account and stores nothing. |
| Record an improvement you already made, so others can see and compare it | Workspace → Write | Your cost figures before and after, and how you measured both. |
| See what others in your industry have done | Discover → Projects | Nothing. |
The Calculator and the Write page share the same formulas, so a figure you try out in the Calculator comes out the same when you turn it into a proposal.
Writing a proposal, start to finish
This follows the actual order of the fields on the Write page. Before you open it, five things are worth having in hand — you can write without any of them, but the proposal then sits at a low trust level:
- The cost BEFORE and the cost AFTER, broken down by category — not a single total.
- How you measured those two figures: hand counts, shift logs, production reports, invoices.
- Monthly volume, working days, shifts per day, hours per shift — the system needs them to bring costs down to a single part.
- The money already invested, if any. If none, tick "This proposal needs no investment".
- Machine names, material codes, specific models — the more specific, the more a reader can match it against their own shop floor.
| Step | What you do | What you have afterwards |
|---|---|---|
| 1 | Go to Workspace → Write. Type the title and pick the Industry. | The two required fields are done. Picking the industry is what makes the fields below suggest the right machines and materials. |
| 2 | Pick the Process, the main KPI type and the difficulty. | These three decide which comparison group your proposal lands in. Leave them blank and it still saves, but it stays out of the ranking. |
| 3 | Write the detailed content, then the three description fields: the problem, the mechanism, the short summary. | This is what a reader reads first. The short summary is what appears in listings, so write it as an answer, not as a headline. |
| 4 | Move to the cost table. For each category involved, click "+ Add row" and fill the Before and After columns. | The panel on the right shows the total and the savings percentage immediately, updating as you type — there is no Calculate button to press. |
| 5 | Fill in the conditions of application and the risks. | These two separate a usable proposal from a boast. A reader needs to know where your improvement does NOT apply. |
| 6 | Fill in how the result was verified and the measurement method. | This is the field that decides the trust level. Be specific: what was measured, with what, against what, who signed it off. |
| 7 | Choose hard cash or cost avoidance. If unsure, leave it blank. | The reader learns whether your figure reaches the invoice or not. |
| 8 | Enter the investment and the implementation time, or tick the no-investment box. | The system works out the months to payback — you do not have to. |
| 9 | Press Save. | The proposal appears under My proposals. From then on, every change to a savings figure is recorded: old value, new value, when. |
About the Before and After columns: Before is the current state, After is once the improvement is in place. If a category is untouched by the improvement, leave BOTH columns blank — do not copy the Before figure into After to fill the gap, because that states a category the improvement has nothing to do with.
The panel titled "What the system reads from your figures" sits in the right-hand column and runs while you type, not after you save. It points out things that are hard to notice yourself: a row contributing almost nothing, a category wildly out of line with the rest, a place where you filled one side and left the other blank. Reading it while typing is worth far more than reading it after forty rows are already in.
If you are not ready to publish anything, use Intelligence → Calculator: same formulas, no account needed, nothing stored. Try figures there first and move to Write later if you want.
The ten cost categories
Costs are split into ten categories. You do not have to fill in all ten — only the ones your improvement actually touches.
| Category | Fill it in when |
|---|---|
| Labor | Someone spends time on the product: running a machine, assembling, inspecting, setting up. |
| Machine | A machine runs: depreciation, power, maintenance, machine time occupied. |
| Material | Material that goes into the product. |
| Scrap | Material or product thrown away. |
| Consumables | Tooling, drills, grinding wheels, cutting fluid — things that wear out and get replaced. |
| Outsourcing | A step done by an outside supplier. |
| Rework | Bad parts repaired to pass, rather than scrapped. |
| Packaging | Boxes, trays, film, dunnage. |
| Logistics | Freight tied to this product. |
| Factory overhead | The share accounting has already allocated to the product. Added per month, not multiplied by volume. |
Blank does not mean zero
This is the easiest thing to get wrong, and getting it wrong produces a wrong cost figure that looks exactly like a right one.
A blank field means you have NOT STATED it, not that you are asserting the category is zero. The system distinguishes the two states and displays them differently. If you genuinely mean "this costs nothing", type 0 — that is an assertion, and it is not the same as leaving the field empty.
The reason: a proposal with half its categories blank still produces a very attractive savings figure. If blank counted as zero, nobody could tell "this improvement really saves a lot" apart from "the author has only filled in half of it".
Hard cash or cost avoidance
These two kinds of saving look identical on paper but behave differently in the accounts, so every proposal should say which one it is.
- Hard cash: after the improvement, the amount actually paid each month goes down compared with what is being paid today. You pay 50 million for electricity, replace the motor, and it becomes 42 million — next month's bill is 8 million lower.
- Cost avoidance: the amount paid does not go down; it simply fails to rise the way it would have. The supplier announces an increase from 50 to 55 million, you renegotiate and change material to hold it at 50 million — the bill is still 50 million, and accounting sees nothing go down.
If you are not sure, leave it blank. Blank means "not stated"; guessing means stating something false, and a reader who knows the trade will notice.
The four trust levels
Every proposal carries a trust level. The system RECALCULATES it from the evidence actually present — it is not a label you pick, and writing at greater length does not raise it.
| Level | What it means |
|---|---|
| Unverified | The figure was calculated by the author, with no measurement evidence. |
| Self-evidenced | The figures are complete and the author has stated how they were measured. |
| Counterpart verified | A factory applied it and agreed the real figure jointly. |
| Platform verified | An independent third party checked it and concluded it holds. |
The "How it was verified" field is the most important one when writing a proposal. Something vague like "we observed a clear reduction" leaves the proposal at the lowest level and out of the ranking, no matter how good the numbers are. Something specific — what was measured, with what, against what, who signed it off — raises the level.
The number of posts never counts towards ranking, not even as a tiebreaker. Posting more does not place you higher.
Comparing against other factories
Ranking and comparison happen WITHIN A SINGLE COUNTRY only. An improvement saving 20% in Vietnam and one saving 20% in Germany cannot be compared directly: labour, power and material prices are too far apart.
For that reason comparisons are measured in percentages and in months to payback, never in absolute money. The exchange rate is taken for real at the moment of saving and then frozen, so an old proposal does not change meaning when rates move.
Grouping with colleagues
Colleagues from the same company are grouped by a random join code, not by naming the employer. You create a code, hand it to a colleague, and whoever enters it joins the same group — which lets you share internal material codes and pool figures without saying where you work.
The code is shown ONCE at creation and is never stored in readable form. If you lose it, nobody can retrieve it, administrators included — create a new one and revoke the old.
When someone applies your improvement
A proposal can go on to become a project with two sides: the one who offered the improvement and the one who applied it. The side that applied it submits the real figures afterwards, and the other reviews and confirms them. Only when both agree is the result recorded as verified.
That is the thing a spreadsheet cannot give you: a number that someone else, at another factory, has put their name to as well.
The ? beside each field
Almost every input field has a ? beside it. It opens that field's own explanation, and each one answers four questions: what it is, when to fill it in and when not to, an example with real numbers, and what other situations the field covers beyond its own name.
The fourth is the one worth reading. A field name is the shortest name, not the fullest one — seeing "Weight (kg)" and assuming it is only for metal means skipping the whole material category when you work in plastics, textiles or wood.
Where a field has a formula, the explanation gives the formula and its source.
Why not just use Excel
That is a fair question, because Excel is faster to type into, freer in layout, and works offline. Costdown does not try to win on any of those three.
There are five things a spreadsheet cannot do, and they are the entire reason Costdown exists:
- Share one library of materials, machines and processes — instead of everyone typing their own spelling of the same thing and then being unable to add the numbers up.
- See figures from other factories in the same industry and the same country.
- Let a counterpart who actually applied your improvement confirm the real number themselves.
- Keep an edit history that cannot be deleted: change a savings figure and the system records the old value, the new value, which account changed it, and when.
- One single formula for everyone — no two spreadsheets producing two answers and an argument about which one is right.
If the work in front of you needs none of those five, Excel really is faster, and we would rather say so plainly.
When something does not match
If anything in the product behaves differently from what this page describes, that is our mistake and not yours — please tell us through the お問い合わせ. Messages are stored and given a case number immediately, so your request does not disappear.
業種別ガイド
一般論ではなく業種ごとに書いています。原価の分解方法、間違いやすい箇所、そして現場のどこに数字があるか。
全業種共通
- 原価低減の事例を、他人が信じられる形で残す方法
Costdown に改善事例を残す四つの手順、証拠で決まる四段階の信頼度、同じ国の中だけで行うベンチマーク、そして検証済み事例の構造を横展開する方法。
- その原価低減は本当にお金になるのか — ボトルネックと三つの条件
設備を速くしても利益が増えないのはなぜか。計算上の削減額が実際の現金になる条件と、投資判断の前に見分ける方法を、工程の制約という観点から整理します。
- 空欄になりやすい六つの項目と、それぞれが原価をどちらへ狂わせるか
歩留り、余裕率、電力費、梱包数量、段取費など、記入されないまま残りやすい項目。空欄と「ゼロ」は別物であり、混同すると正しく見える誤った原価が生まれます。
- 原価計算の式 — 二つの式は、違う問いに答えている
期間の会計の式と単位原価の式は別の問いに答えます。会計の三区分と10費目の対応表、そして二つの数字がずれるのが正常である理由。
機械加工・精密切削
- 機械加工の原価計算 — 10費目を工程順にたどる
切削加工品の原価を、材料・機械時間・労務・工具・不良・手直し・外注・梱包・運賃・間接費まで漏れなく積み上げる方法。同じ図面で二人が違う金額を出す理由から説明します。
- データがない工場が原価計算をどこから始めるか
システムも一か月の調査も要りません。部品を一つ選び、三つの数字を一週間で測り、残りは既にある帳票から取る。それで根拠のある原価が一つできます。
- 工具費を一個あたりに換算する方法と、下げ方三つ
切削工具は箱で買い、一個ずつ減っていきます。その換算方法、何も買わずに工具寿命を測る方法、そして実際に利益に届く三つの改善。
板金:レーザー切断・曲げ
- 板金加工の原価計算 — 工程ごとに違う単位で測る
レーザー切断と曲げを含む板金部品の原価を10費目で積み上げる方法。切断は切断長、抜きは打数、曲げは曲げ数 — 平均してしまうと本当の原価要因が見えなくなります。
- ネスティングと歩留り、そしてスケルトンの本当の値段
板金原価では材料が最大の費目になることが多く、その大半はネスティングで決まります。実歩留りの測り方、スケルトンの評価、そして原価表を必ず良く見せてしまう二重控除。
縫製
- 縫製品の原価計算 — CM工賃の中身を10費目に分ける
生地、附属、裁断、縫製分、仕上げ、梱包まで。バイヤーに提示する加工賃が何でできているかを分解し、価格交渉を勘ではなく根拠で行えるようにします。
- 標準時間・分単価・稼働率 — 縫製費を決める三つの数字
縫製費は標準時間 × 分単価 ÷ 稼働率。三つとも間違えやすく、しかも三つの誤りがすべて同じ方向 — 原価を安く見せる方向 — に働きます。
- 一着あたりの要尺と、生地が実際に消える場所
生地は縫製原価で最大の費目です。要尺をマーカーから取る方法、マーカー効率が測っているものの範囲、そしてマーカーには決して現れない損失について。
射出成形・ゴム
- 射出成形の原価計算 — ショット重量・サイクル・取り数
成形品の原価を10費目で積み上げる方法。ほぼすべてが三つの数字に帰着し、そのどれか一つを間違えると原価表全体が動きます。
- 型償却と取り数の経済性 — 金型判断の裏にある算数
取り数を増やせば型は高く、部品は安くなる — ある点までは。型費を正直に配分する方法と、二つの取り数案を勘ではなく数字で比べる方法。
- 粉砕材と回収価値 — 唯一のマイナス項目
ランナーや不良品は粉砕して再び成形できます。その回収をどう評価するか、そして原価表を静かに良く見せてしまう二重控除について。
- ゴム成形の原価 — 射出成形とほぼ同じ、決定的な一点を除いて
加硫ゴム部品の原価計算。構造は射出成形とほぼ一致しますが、バリを粉砕して戻せない — その一点が、どこを改善する価値があるかを変えます。
家具製造
- 家具製造の原価計算 — 三つの材料、三つの違う単位
収納や椅子の原価を10費目で積み上げる方法。板材・エッジ材・金物はそれぞれ買う単位が違い、これを一行にまとめると材料費が静かに壊れます。
- 板取りの歩留り — 最短時間で最大の金額が動く数字
板材費は部品の面積ではなく、開けた板の枚数で決まります。既にある記録から実歩留りを測る方法と、最適化ソフトの理論値で原価を作ってはいけない理由。
- かさばる荷物の運賃 — 重さより先に容積が埋まる
家具の運賃は重量ではなく容積で決まり、それが改善の価値を変えます。一台あたりの計算方法と、ノックダウンが設計判断である前に原価判断である理由。
印刷・紙器
- 印刷物の原価計算 — ロットで発生する費用と、部数に比例する費用
印刷の原価を10費目で積み上げる方法。この業種は一件ごとの費用と一部ごとの費用の混在が最も激しく、両者を混ぜると小ロットが不当に安く見えます。
- ヤレ紙 — 数量に比例しない材料費
色出しで潰す紙は、変動費の顔をした固定費です。原価表のどこに置くかで、小ロットの価格が正しくなるかどうかが決まります。
- 紙の使用量 — 何面付けか、そして裁ち落としはいくらか
印刷原価で紙は最大の費目になることが多く、その大半は面付けで決まります。実使用量の測り方、用紙サイズの問いを機械の問いより先に立てる理由、そして損紙の本当の値段。
食品加工
- 食品加工の原価計算 — 歩留り、バッチ、そしてバッチとバッチの間
加工食品の原価を10費目で積み上げる方法。原料は工程ごとに目減りし、洗浄や切替など「バッチの間」に発生する費用は個数ではなくバッチに属します。
- 加工歩留りは掛け算で減る、足し算ではない
工程ごとの損失は積み重なるので、小さな損失の連続は合計よりずっと大きくなります。既にある二つの数字で連鎖全体を測る方法と、過量充填が隠れている場所。
- 洗浄と切替 — 一個あたりではなく、バッチあたりの費用
バッチ間の洗浄費用はバッチが大きくても小さくてもほぼ同じ。それが小ロットを高くしている本当の理由です。計上方法と、最小バッチの決め方。
酒類
- 酒類の原価計算 — 時間そのものがいくらかかるか
原料と加工に加えて、熟成が三つの費用を生みます — 動かせない資金、天使の分け前、そして何か月も占有される貯蔵スペース。
たばこ製品
- たばこ製品の原価 — 水分で使用量の数字が動く
バッチ原価は食品加工と同じで、固有の点が一つ — 原料重量が水分で変わるため、共通の基準に換算しないとロット間の比較ができません。
電子機器組立
- 基板実装の原価計算 — 部品、実装点数、そしてBOMに載らないもの
実装基板の原価を10費目で積み上げる方法。この業種を分けるのは二つ — 部品表が原価を支配すること、そして機械時間が基板枚数ではなく実装点数に比例すること。
- 数百行のBOM — 合計を変えずに末尾をまとめる
部品表の大半は、合計してもほとんど動かない安価な部品です。表を読める長さに保ちながら合計を一致させる方法と、まとめると必要なものが消える三つの場合。
- 実装点数と切替 — SMT価格を決める二つの数字
SMTの組立費は、何点実装するかと、何回段取りするかで決まります。どちらもラインが既に出しているデータから測れ、それぞれ別の改善を指します。
半導体:組立・検査
- 半導体 後工程の原価計算 — 不良が最も高くつく業種
ダイボンド、ワイヤボンド、封止、検査の原価。最も高価な部材が最初の工程で製品の中に入るため、後の工程で失うほど損失が跳ね上がります。
機械製造・産業機械
- 機械一台の原価計算 — 部品から積み上げる、時間から割り下ろさない
産業機械や装置の原価を10費目で。内製品・購入品・外注品はそれぞれ計算方法が違い、材料を支給したときに二重計上が起きます。試運転も費用の一行です。
- 初期費用 — 設計・治具・初号機、そして何台で割るか
少量では一回限りの費用が薄まりません。どれが一回限りかの判定、割る台数の選び方、そして無視すると見積が安く見えて赤字になる仕組み。
溶接・鉄骨構造
- 溶接構造物の原価計算 — 個数ではなく溶接長で測る
鉄骨・溶接構造物の原価を10費目で。同じ重量の二つの製品が大きく違う原価になるのは、この業種を動かしているのが溶接長とアークタイムだからです。
- 溶接ひずみ — 原価表のどの行にも現れない費用
熱は鋼を動かし、その矯正に使った金は四つの費目に散らばって誰にも見えません。一つの数字にまとめる方法と、量が増えると治具が矯正に勝つ理由。
革製品・靴
- 革製品の原価 — 縫製と同じ、ただし材料が均一でない
靴や革製品の原価計算。ライン生産と標準時間は縫製とまったく同じですが、革は形も品質も一枚ごとに違うので、理論要尺はほとんど意味を持ちません。
化学品製造
- 化学品の原価 — 食品加工と同じ、加えて売れる副産物
バッチ式化学品の原価計算。歩留りの連鎖もバッチ間の洗浄も食品加工と同じで、一つ加わるのは、売れる産物が複数あるときの費用の按分です。
建材
- 建材の原価 — 運賃が脚注ではなく主要費目
生コン、ブロック、二次製品の原価計算。原料が安くて重いので、重量と距離で決まる運賃が加工費を上回ることが多く、配送圏が原価表の一部になります。
自動車部品
- 自動車部品の原価 — 機械製造と同じ構造、量産で裏返る
車両向け部品・ユニットの原価計算。積み上げ方は機械製造と同じですが、量産のため一回限りの費用が沈み、代わりに品質費用が浮上します。
航空・宇宙部品
- 航空部品の原価 — 削り出し比率と、書類の費用
航空機部品の原価計算。工程は機械加工と同じですが、素材が高価なため削り落とす比率が決定的で、証明書類の作成も実在する費用です。
医療機器
- 医療機器の原価 — 生産環境を維持する費用を足す
医療機器の原価計算。組立は電子機器、樹脂部品は射出成形に従い、加えて固有の費目が一つ — 生産環境の維持は生産量ではなく時間で発生します。
スポーツ用品
- スポーツ用品の原価 — 一つの製品、下にいくつもの原価表
ラケット、シューズ、自転車は樹脂・繊維・木・革・金属を一つの製品に組み合わせます。各部を対応する業種の方法で計算し、細部を失わずに合計する方法。
再生可能エネルギー機器
- 再生可能エネルギー機器の原価 — 三業種が一製品、そして守る境界
パネル、パワコン、架台の原価計算。部分ごとに別のガイドに従い、原価表は工場出荷までで止めます — 現地据付は製品ではなく役務です。
単品で数えない業種
- 製品が「一個」でない業種 — 何を単位にするかを先に決める
建設、運輸、資源、電力・水道、農林水産には数えられる製品がありません。使える単位の選び方と、この製品がまだ応えられない点を正直に書きます。